Concrete Pour Calculator

Concrete Pour Calculator

Use this calculator to estimate the amount of concrete needed for your project, whether it's a slab, footing, or pathway. Accurate measurements help prevent over-ordering or under-ordering, saving you time and money.

Feet (L/W) & Inches (T) Meters (L/W) & Centimeters (T)

Understanding Concrete Volume

Concrete is typically ordered and priced by the cubic yard (or cubic meter in some regions). Calculating the correct volume is crucial for any concrete project. This calculator simplifies the process by taking your project's dimensions and converting them into the standard unit for concrete ordering.

How to Use the Calculator:

  1. Measure Length: Enter the total length of your concrete area.
  2. Measure Width: Enter the total width of your concrete area.
  3. Measure Thickness (Depth): Enter the desired thickness or depth of your concrete slab or footing.
  4. Select Units: Choose whether your measurements are in "Feet & Inches" (Length/Width in feet, Thickness in inches) or "Meters & Centimeters" (Length/Width in meters, Thickness in centimeters).
  5. Add Waste Percentage: It's always a good idea to add a small percentage (e.g., 5-10%) for waste, spillage, uneven subgrades, or minor miscalculations. This ensures you don't run short during the pour.
  6. Click "Calculate Concrete": The calculator will display the estimated cubic yards (or cubic meters) of concrete needed.

Why is a Waste Percentage Important?

Even with precise measurements, several factors can lead to needing slightly more concrete than the theoretical volume:

  • Uneven Subgrade: The ground beneath your pour is rarely perfectly level, leading to variations in thickness.
  • Spillage: Some concrete can be spilled during mixing, transport, or placement.
  • Formwork Imperfections: Forms might not be perfectly square or plumb, leading to slight overfills.
  • Settlement: Concrete can settle slightly, especially if the subgrade isn't perfectly compacted.

Adding a small waste percentage (typically 5-10%) is a standard practice in the industry to ensure you have enough material to complete the job without costly delays or additional small-batch orders.

Example Calculation:

Let's say you're pouring a patio that is 15 feet long, 10 feet wide, and 4 inches thick. You want to add a 7% waste factor.

  • Length: 15 feet
  • Width: 10 feet
  • Thickness: 4 inches
  • Units: Feet & Inches
  • Waste Percentage: 7%

The calculator would perform the following steps:

  1. Convert thickness to feet: 4 inches / 12 = 0.3333 feet
  2. Calculate volume in cubic feet: 15 ft * 10 ft * 0.3333 ft = 50 cubic feet
  3. Convert to cubic yards: 50 cubic feet / 27 cubic feet/yard = 1.85 cubic yards
  4. Apply waste: 1.85 cubic yards * (1 + 7/100) = 1.85 * 1.07 = 1.98 cubic yards

You would likely order 2.0 cubic yards of concrete to be safe.

.concrete-pour-calculator { font-family: Arial, sans-serif; max-width: 600px; margin: 20px auto; padding: 20px; border: 1px solid #ccc; border-radius: 8px; background-color: #f9f9f9; } .concrete-pour-calculator h2, .concrete-pour-calculator h3, .concrete-pour-calculator h4 { color: #333; text-align: center; margin-bottom: 15px; } .concrete-pour-calculator p { line-height: 1.6; margin-bottom: 10px; } .concrete-pour-calculator .calculator-form label { display: block; margin-bottom: 5px; font-weight: bold; } .concrete-pour-calculator .calculator-form input[type="number"], .concrete-pour-calculator .calculator-form select { width: calc(100% – 22px); padding: 10px; margin-bottom: 15px; border: 1px solid #ddd; border-radius: 4px; box-sizing: border-box; } .concrete-pour-calculator .calculator-form button { background-color: #007bff; color: white; padding: 12px 20px; border: none; border-radius: 4px; cursor: pointer; font-size: 16px; width: 100%; box-sizing: border-box; } .concrete-pour-calculator .calculator-form button:hover { background-color: #0056b3; } .concrete-pour-calculator #concreteResult { text-align: center; font-size: 1.2em; color: #007bff; } .concrete-pour-calculator ol, .concrete-pour-calculator ul { margin-left: 20px; margin-bottom: 10px; } .concrete-pour-calculator li { margin-bottom: 5px; } function calculateConcrete() { var lengthInput = document.getElementById("length").value; var widthInput = document.getElementById("width").value; var thicknessInput = document.getElementById("thickness").value; var inputUnits = document.getElementById("inputUnits").value; var wastePercentageInput = document.getElementById("wastePercentage").value; var resultDiv = document.getElementById("concreteResult"); var length = parseFloat(lengthInput); var width = parseFloat(widthInput); var thickness = parseFloat(thicknessInput); var wastePercentage = parseFloat(wastePercentageInput); if (isNaN(length) || isNaN(width) || isNaN(thickness) || isNaN(wastePercentage) || length <= 0 || width <= 0 || thickness <= 0 || wastePercentage < 0) { resultDiv.innerHTML = "Please enter valid positive numbers for all fields."; return; } var volumeCubicYards = 0; var volumeCubicMeters = 0; var finalVolume = 0; var outputUnit = ""; if (inputUnits === "feet_inches") { // Convert thickness from inches to feet var thickness_ft = thickness / 12; var volumeCubicFeet = length * width * thickness_ft; volumeCubicYards = volumeCubicFeet / 27; // 1 cubic yard = 27 cubic feet finalVolume = volumeCubicYards * (1 + wastePercentage / 100); outputUnit = "cubic yards"; } else if (inputUnits === "meters_cm") { // Convert thickness from cm to meters var thickness_m = thickness / 100; volumeCubicMeters = length * width * thickness_m; volumeCubicYards = volumeCubicMeters * 1.30795; // 1 cubic meter = 1.30795 cubic yards finalVolume = volumeCubicYards * (1 + wastePercentage / 100); outputUnit = "cubic yards"; // Still outputting in cubic yards as it's a common ordering unit } resultDiv.innerHTML = "Estimated Concrete Needed: " + finalVolume.toFixed(2) + " " + outputUnit + " (including " + wastePercentage.toFixed(0) + "% waste)"; }