Cut Fill Calculations

Cut and Fill Volume Calculator

(e.g., 15 for 15% expansion when excavated)
(e.g., 10 for 10% volume reduction when compacted)
function calculateCutFill() { var projectArea = parseFloat(document.getElementById("projectArea").value); var avgCutDepth = parseFloat(document.getElementById("avgCutDepth").value); var avgFillDepth = parseFloat(document.getElementById("avgFillDepth").value); var swellFactor = parseFloat(document.getElementById("swellFactor").value); var shrinkageFactor = parseFloat(document.getElementById("shrinkageFactor").value); var resultDiv = document.getElementById("result"); resultDiv.style.display = "none"; // Hide previous results if (isNaN(projectArea) || isNaN(avgCutDepth) || isNaN(avgFillDepth) || isNaN(swellFactor) || isNaN(shrinkageFactor) || projectArea <= 0 || avgCutDepth < 0 || avgFillDepth < 0 || swellFactor < 0 || shrinkageFactor = 1) { // Shrinkage cannot be 100% or more, as it would mean infinite loose volume needed resultDiv.style.backgroundColor = "#f8d7da"; resultDiv.style.borderColor = "#f5c6cb"; resultDiv.style.color = "#721c24"; resultDiv.innerHTML = "Shrinkage Factor cannot be 100% or more."; resultDiv.style.display = "block"; return; } requiredLooseFillVolume_cuft = requiredCompactedFillVolume_cuft / (1 – shrinkageDecimal); var requiredLooseFillVolume_cuyards = requiredLooseFillVolume_cuft / CUBIC_FEET_PER_CUBIC_YARD; // 5. Net Material Balance (Loose Volume) var netMaterialBalance_cuyards = looseCutVolume_cuyards – requiredLooseFillVolume_cuyards; var balanceMessage = ""; if (netMaterialBalance_cuyards > 0) { balanceMessage = "You have an excess of " + netMaterialBalance_cuyards.toFixed(2) + " CY of loose material. This material will need to be exported."; } else if (netMaterialBalance_cuyards < 0) { balanceMessage = "You have a deficit of " + Math.abs(netMaterialBalance_cuyards).toFixed(2) + " CY of loose material. This material will need to be imported."; } else { balanceMessage = "Your cut and fill volumes are perfectly balanced. No import or export needed."; } resultDiv.style.backgroundColor = "#e9f7ef"; resultDiv.style.borderColor = "#d4edda"; resultDiv.style.color = "#155724"; resultDiv.innerHTML = "

Calculation Results:

" + "Bank Cut Volume (in-situ): " + bankCutVolume_cuyards.toFixed(2) + " Cubic Yards" + "Loose Cut Volume (after excavation): " + looseCutVolume_cuyards.toFixed(2) + " Cubic Yards" + "Required Compacted Fill Volume: " + requiredCompactedFillVolume_cuyards.toFixed(2) + " Cubic Yards" + "Required Loose Fill Volume (to achieve target compacted fill): " + requiredLooseFillVolume_cuyards.toFixed(2) + " Cubic Yards" + "
" + "Net Material Balance: " + balanceMessage + ""; resultDiv.style.display = "block"; }

Understanding Cut and Fill Calculations in Earthwork

Cut and fill calculations are fundamental to any construction or landscaping project that involves altering the natural grade of the land. This process, often referred to as earthwork, involves excavating (cutting) soil from one area and using it to build up (filling) another area to achieve a desired elevation or contour. Accurate calculations are crucial for budgeting, scheduling, and ensuring the stability and success of the project.

What is Cut and Fill?

  • Cut: Refers to the removal of earth material from a site. This is typically done when the existing ground elevation is higher than the proposed finished grade.
  • Fill: Refers to the addition of earth material to a site. This is necessary when the existing ground elevation is lower than the proposed finished grade.

The goal of cut and fill operations is often to balance the amount of material cut with the amount of material needed for fill, minimizing the need to import or export soil, which can significantly reduce project costs and environmental impact.

Key Factors in Cut and Fill Calculations

Several factors influence the volume of material involved in earthwork:

  1. Project Area: The total horizontal area (e.g., in square feet or square meters) over which the cut and fill operations will take place.
  2. Average Cut Depth: The average vertical distance (in feet or meters) that material needs to be removed from the ground. This is often determined by surveying existing and proposed elevations.
  3. Average Fill Depth: The average vertical distance (in feet or meters) that material needs to be added to the ground to reach the desired grade.
  4. Soil Swell Factor: When soil is excavated, it becomes "loose" and occupies a larger volume than it did in its natural, undisturbed (bank or in-situ) state. The swell factor accounts for this expansion, typically expressed as a percentage. For example, a 15% swell factor means 100 cubic yards of bank material will become 115 cubic yards when excavated.
  5. Soil Shrinkage Factor: When loose soil is compacted for fill, it reduces in volume. The shrinkage factor accounts for this reduction, also expressed as a percentage. For instance, a 10% shrinkage factor means that 100 cubic yards of loose material might compact down to 90 cubic yards. This is critical for determining how much loose material is actually needed to achieve a target compacted fill volume.

How to Use the Calculator

Our Cut and Fill Volume Calculator simplifies these complex calculations. Here's how to use it:

  1. Project Area (Square Feet): Enter the total horizontal area of your project in square feet.
  2. Average Cut Depth (Feet): Input the average depth of material you need to remove.
  3. Average Fill Depth (Feet): Input the average depth of material you need to add.
  4. Soil Swell Factor (%): Enter the estimated swell percentage for your soil type. Common values range from 10% to 30%.
  5. Soil Shrinkage Factor (%): Enter the estimated shrinkage percentage for your soil type. Common values range from 5% to 20%.
  6. Click "Calculate Cut & Fill" to see the results.

Understanding the Results

The calculator will provide the following key volumes, typically in Cubic Yards (CY):

  • Bank Cut Volume (in-situ): The volume of material as it exists in its natural, undisturbed state before excavation.
  • Loose Cut Volume (after excavation): The expanded volume of material once it has been excavated and is in a loose state. This is the volume you have available from your cuts.
  • Required Compacted Fill Volume: The target volume of material needed after it has been compacted to achieve the desired grade.
  • Required Loose Fill Volume (to achieve target compacted fill): The total volume of loose material you would need to source (either from your cuts or by importing) to achieve the required compacted fill, taking shrinkage into account.
  • Net Material Balance: This is the crucial figure. It tells you if you have an excess of loose material (meaning you'll need to export it) or a deficit (meaning you'll need to import additional material). A positive number indicates excess, while a negative number indicates a deficit.

By accurately calculating these volumes, you can make informed decisions about equipment needs, material sourcing, and overall project logistics, leading to more efficient and cost-effective earthwork operations.