function calculateLoadFactor() { var kwh = parseFloat(document.getElementById('energy_kwh').value); var peak = parseFloat(document.getElementById('peak_demand').value || document.getElementById('peak_kw').value); var days = parseFloat(document.getElementById('period_days').value); var resultArea = document.getElementById('result_area'); var resultDisplay = document.getElementById('lf_percentage'); var interpretation = document.getElementById('lf_interpretation'); if (isNaN(kwh) || isNaN(peak) || isNaN(days) || peak <= 0 || days 100) { interpretation.innerHTML = "Note: A load factor over 100% is physically impossible (it implies usage exceeded peak). Check your input values."; resultDisplay.style.color = "#e74c3c"; } else if (loadFactor >= 70) { interpretation.innerHTML = "High efficiency. Your energy usage is very consistent."; resultDisplay.style.color = "#27ae60"; } else if (loadFactor >= 40) { interpretation.innerHTML = "Moderate efficiency. There is room to optimize peak demand."; resultDisplay.style.color = "#f39c12"; } else { interpretation.innerHTML = "Low efficiency. Your peak demand is much higher than your average usage."; resultDisplay.style.color = "#e67e22"; } }

Understanding Load Factor: A Guide to Energy Efficiency

Load factor is a critical metric used by electrical engineers, utility companies, and facility managers to determine how efficiently electricity is being used. In simple terms, it measures the "steadiness" of electricity consumption over a specific period.

How Do You Calculate Load Factor?

The calculation of load factor involves comparing the total energy consumed (kilowatt-hours) against the maximum potential energy that could have been consumed if the peak demand remained constant throughout the entire period. The standard formula is:

Load Factor (%) = [Total kWh / (Peak Demand in kW × Hours in Period)] × 100

Step-by-Step Calculation Example

To better understand the process, let's look at a realistic industrial example:

  • 1. Identify the Period: Usually one month (30 days). 30 days × 24 hours = 720 hours.
  • 2. Find Total Consumption: Assume a factory used 36,000 kWh this month.
  • 3. Identify Peak Demand: Assume the highest demand reached at any single moment was 100 kW.
  • 4. Apply the Formula: 36,000 / (100 × 720) = 0.50.
  • 5. Convert to Percentage: 0.50 × 100 = 50%.

Why a High Load Factor is Desirable

A high load factor (approaching 100%) indicates that the load is constant. Utility companies often incentivize high load factors because it allows them to predict demand more accurately and operate their power plants more efficiently. Conversely, a low load factor means you have high "peaks"—perhaps caused by turning on all heavy machinery at once—which forces the utility to maintain capacity that you rarely use, leading to higher "demand charges" on your bill.

Alternative Definitions of Load Factor

While the electrical definition is the most common for calculations, the term "Load Factor" is used in other industries with different formulas:

Industry Definition Core Formula
Aviation Ratio of lift to aircraft weight. Lift / Weight
Real Estate The ratio of rentable square footage to usable space. Rentable SF / Usable SF
Logistics Measure of vehicle capacity utilization. Actual Weight / Max Capacity

How to Improve Your Electrical Load Factor

If your calculator result is below 40%, you may be paying unnecessary demand penalties. You can improve your load factor by:

  • Load Shifting: Running heavy equipment during off-peak hours.
  • Staggered Startups: Avoiding turning on all large motors simultaneously.
  • Peak Shaving: Using on-site batteries or generators during periods of maximum demand.